METARs Aviation Weather

RKSS

SEOUL/KIMPO INTL

Bucheon Gyeonggi-do South Korea

Latest METAR

MVFR

Observed

Observed 35 min ago

METAR RKSS 231000Z 27005KT 6000 BKN045 BKN080 10/10 Q1018 NOSIG

Terminal forecast (TAF)

Issued

TAF AMD RKSS 230555Z 2306/2412 22010KT 9999 BKN020 OVC080 TNM02/2321Z TX04/2406Z TEMPO 2306/2308 -TSRA SCT015CB BKN020 OVC080 BECMG 2309/2311 30008KT SCT045 BECMG 2401/2403 31015G25KT CAVOK BECMG 2410/2412 32007KT

METAR history

Tuesday, November 17, 2026 · UTC

No METAR reports are available for this date.

No FAA weather cameras found within 30 NM.

Airport NOTAMs

FAA NOTAM Search

FAA NOTAM feed · Synced

Listed schedules apply within the effective dates.

Active (5)
  • A1705/26

    Effective · End

    Schedule · 1400-2000

    TWY P2 CLSD DUE TO WIP

  • V0491/26

    Effective · End

    [US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED ILS OR LOC RWY 32L.

  • A1591/26

    Effective · End

    RKSS AIP AD 2.22 FLIGHT PROCEDURE 1.2 SPEED RESTRICTION CHG AS FLW 1. ALL AIRCRAFT SHALL NOT EXCEED 250KT IAS BELOW 10000FT IN SEOUL TMA. 2. ON DEPARTURE, IF UNABLE TO COMPLY WITH THE SPEED SPECIFIED IN 1.2.1. DUE TO AIRCRAFT PERFORMANCE GIVEN THE AIRCRAFT CONFIGURATION, NOTIFY ATC OF MINIMUM SAFE SPEED REQUIRED.

  • A1485/26

    Effective · End

    Schedule · 1400-2000

    RWY 14R/32L CLSD DUE TO WIP

  • A1353/26

    Effective · End

    ACFT STAND NR 17 CLSD DUE TO CONST

Upcoming (3)
  • A1725/26

    Effective · End

    TEMP OBST(CRANE ) ERECTED AS FLW : 1.PSN: 373323.5N1264553.8E, RADIUS: 60M, ELEV : 67.8M(222.4FT) AMSL, HGT: 58.8M(192.9FT) AGL 2.PSN: 373324.2N1264556.9E, RADIUS: 60M, ELEV : 73.8M(242.1FT) AMSL, HGT: 64.8M(212.6FT) AGL 3.PSN: 373326.0N1264554.4E, RADIU : 60M, ELEV : 79.8M(261.8FT) AMSL, HGT: 70.8M(232.3FT) AGL

  • Z0810/26

    Effective · End

    FIREWORKS WILL TAKE PLACE AS FLW : A CIRCLE RADIUS 100M CENTERED ON 373547N1264720E

  • Z0871/26

    Effective · End

    TRIGGER NOTAM - PERM AIRAC AIP AMDT 12/26 WEF 1600 UTC 23 DEC 2026 - INFORMATION OF SPEED RESTRICTION AND INITIAL RADIO CALL PROCEDURES WITH SEOUL APPROACH.